Use site reporting

Use site reporting


The Reporting opérationnel chantier profile helps you track site resources and outputs. With the Resources exports, you can then prepare an Excel table and a PDF resource booklet from the data entered in the project.


This is operational tracking. It can support a PEMD preparation workflow, but it is not a complete regulatory PEMD diagnosis or completion report.


Enable the site reporting profile


  1. Open the project.
  2. In Project actions, select Edit project.
  3. In Profil de suivi (tracking profile), choose Reporting opérationnel chantier.
  4. Save the changes.


The project then offers adapted views and indicators in Resources, Outputs, Overview, and Statistics.


Prepare the Resources view


  1. Open Resources.
  2. Open the grid view menu (the button with an eye icon that shows the name of the current view).
  3. Select the Chantier opérationnel view, which shows the instructions below.
  4. Check the useful columns before entering data.


The Chantier opérationnel view highlights the instructions used by resource sheets:


  • fixing mode;
  • removal method;
  • transport;
  • storage;
  • conditioning;
  • reuse tracks;
  • risks and precautions.


If these columns are not visible, ask an administrator of your team to contact Skop support.


Fill in resources


To get useful reporting, fill in each resource with the available data:


  1. Add the name, category, materials, quantity, and unit.
  2. Add volume, weight, carbon saving, and reuse rate when known.
  3. Select the target outlet if the planned destination is identified.
  4. Add preparation instructions and reuse tracks.
  5. Add photos if the resource should appear in the PDF booklet.


Exports work with partial data. In the Excel table, the Alertes column flags missing information; in the PDF booklet, a resource without a photo shows "Aucune photo" and a missing target outlet shows "Non renseigné".


Track site outputs


  1. Open Outputs.
  2. Use the Chantier opérationnel view.
  3. Check outputs to complete: actual outlet, destination, actual weight, proof image, signature, and note.
  4. Correct rows without proof, weight, destination, or signature before sharing reporting.


Outputs help compare the planned target with what happened on site. They do not replace the regulatory evidence expected in a complete PEMD deliverable.


Read Overview and Statistics


In Overview and Statistics, check tracking indicators before exporting, for example actual outlets, outputs without an actual outlet, and total time when it is filled in.


If an indicator looks incomplete, first return to Resources or Outputs to check missing fields.


Export documents


When the data is ready, open Resources, select the rows to include, then use Export items.


Two site-specific exports are listed in this menu:


  • Excel - Site valorization table;
  • PDF - Site resource booklet.


See the detailed guide: Export site reporting documents.


Check quality before sharing


Before sending a document to a stakeholder, check:


  • rows without quantity, weight, volume, or unit;
  • resources without a photo when the PDF booklet is expected;
  • resources without a target outlet;
  • missing removal or safety instructions;
  • outputs without proof image, actual weight, or signature;
  • information that is an assumption.


Do not fill in a value by approximation if it needs to be used as evidence. Leave it empty or add a note explaining what must be confirmed.


Frequently asked questions


What is the difference with the Standard profile?


The Standard profile keeps classic project tracking. Reporting opérationnel chantier adds views and indicators designed for site tracking.


Are instruction texts generated automatically?


No. Instructions shown in the booklet come from fields filled in on the resource.


Is site reporting a PEMD deliverable?


No. Site reporting helps structure resources, outputs, and tracking documents. A complete PEMD deliverable still needs a regulatory scope, responsibilities, evidence, and dedicated fields.

Updated on: 26/11/2026

Was this article helpful?

Share your feedback

Cancel

Thank you!